Concrete shall be provided to the pile by transit mixers and positioned by the complete length tremie pipe approach. Link a hopper to the highest of tremie pipe. Following that, near the joint amongst hopper and tremie pipe by using a steel plug just before concrete 1st charge. The varied https://garrettmdimt.blogofchange.com/33137580/the-5-second-trick-for-cast-in-situ-piles-in-dhaka